Operations & Systems · AI Skill

Project Tracker

Project Tracker is an AI skill for operations & systems from the Skills Library that creates a project management database in Notion with tasks, statuses, owners, due dates, and priorities, pre-populated from a project brief or scope document.

When to use: a user needs to set up project tracking for a new engagement, wants to replace spreadsheet-based task management, or needs a lightweight PM system without paid software.
NotionAsana

The Project Tracker skill

The full method below is exactly what gets copied to your workspace — ready to paste into Claude, ChatGPT, or Gemini.

When to Use This Skill

Use this skill when you need to:

  • Create a project task database in Notion from a project brief, scope document, or verbal description
  • Replace a spreadsheet, whiteboard, or sticky-note system for tracking project tasks
  • Set up task tracking for a new client engagement, product launch, or internal initiative
  • Build a lightweight project management system without paying for Asana, Monday, or ClickUp
  • Pre-populate a task board with phases, owners, due dates, and priorities from a project plan

DO NOT use this skill for:

  • Client or contact relationship tracking (use a client-crm skill instead)
  • Kanban-only boards with no task metadata (just use a plain Notion board)
  • Enterprise portfolio management across dozens of projects (too complex for a single database)
  • Time tracking or invoicing (different schema and tooling needed)
  • Recurring task management or habit tracking (this is for finite project scopes)

Quick Reference: Project Tracker Features

FeatureDetails
Properties9 fields per task record
Status stages5 (Not Started through Blocked)
Priority levels4 (Urgent, High, Medium, Low)
Database views5 pre-built filtered views
SeedingBulk import from project brief, scope doc, or task list
Usage guideCommon operations documented for the user

Quick Reference: Database Schema

PropertyTypePurposeDefault/Options
Task NameTitleShort, action-oriented task descriptionRequired
StatusSelectCurrent state of the taskNot Started
PrioritySelectUrgency and importance levelMedium
OwnerRich textPerson responsible for the taskEmpty
Due DateDateDeadline for task completionEmpty
Project PhaseSelectWhich phase of the project this task belongs toSee options below
DescriptionRich textDetailed requirements, acceptance criteria, or notesEmpty
DependenciesRich textOther tasks that must complete before this one can startEmpty
TagsMulti-selectCategories for filtering and groupingSee options below

Status Options

Not Started --> In Progress --> In Review --> Complete --> Blocked
StatusMeaningAction Required
Not StartedTask is defined but work has not begunAssign owner and due date if missing
In ProgressActively being worked onOwner updates Description with progress notes
In ReviewWork is done, awaiting approval or feedbackReviewer provides feedback within 2 business days
CompleteTask is finished and approvedNo further action needed
BlockedCannot proceed due to a dependency or issueLog the blocker in Description, escalate to project lead

Priority Options

PriorityColorWhen to Use
UrgentRedBlocks other tasks or has a deadline within 48 hours
HighOrangeCritical path item, needed this week
MediumYellowStandard task, due within the current phase
LowGrayNice-to-have, can slip without impacting the project

Default Project Phase Options

Phases are customized per project. If the user does not specify phases, use these defaults:

PhasePurpose
PlanningResearch, requirements gathering, scoping
DesignWireframes, mockups, architecture, strategy
BuildDevelopment, writing, creation, production
ReviewTesting, QA, feedback, revisions
LaunchDeployment, go-live, publishing, delivery

Default Tag Options

milestone, client-facing, internal, content, design, development, admin, research, meeting, deliverable


Core Workflow

EVERY PROJECT TRACKER STARTS BY GATHERING THE PROJECT DETAILS AND CREATING THE DATABASE WITH THE FULL SCHEMA BEFORE ADDING ANY TASKS -- NEVER ADD PAGES TO A DATABASE THAT IS MISSING PROPERTIES.

Phase 1: Gather Project Details

Collect these details from the user before building anything:

  1. Project name -- what is this project called
  2. Notion parent page -- where should the tracker database live (page name or URL)
  3. Project phases -- custom phase names, or accept the 5 defaults (Planning, Design, Build, Review, Launch)
  4. Team members -- list of people who will own tasks (names only; these go in the Owner field)
  5. Timeline -- overall start date, end date, or phase-level deadlines
  6. Project brief or task list -- a scope document, brief, bullet list, or verbal description of what needs to get done

If the user provides only items 1 and 2, proceed with all defaults and generate tasks from context. Ask only about missing critical details.

Brief template for vague requests:

I'll build your project tracker in Notion. Quick answers needed:

1. What is the project name?
2. Which Notion page should I create the tracker under?
3. What are the project phases? (default: Planning, Design, Build, Review, Launch)
4. Who are the team members? (names for task ownership)
5. What is the timeline? (start date, end date, or key deadlines)
6. Do you have a project brief, scope doc, or task list I should use to pre-populate tasks?

Phase 2: Create the Database in Notion

  1. Call notion-search with the page name or keywords the user provided to locate the parent page
  2. Confirm the parent page with the user if multiple matches exist
  3. Call notion-create-database with the parent page ID and full schema:

Database title: [Project Name] Tracker

Properties to create:

Task Name      -> title
Status         -> select
  options: Not Started, In Progress, In Review, Complete, Blocked
  colors:  gray, blue, purple, green, red
Priority       -> select
  options: Urgent, High, Medium, Low
  colors:  red, orange, yellow, gray
Owner          -> rich_text
Due Date       -> date
Project Phase  -> select
  options: [user's custom phases OR defaults: Planning, Design, Build, Review, Launch]
  colors:  blue, purple, orange, green, pink
Description    -> rich_text
Dependencies   -> rich_text
Tags           -> multi_select
  options: milestone, client-facing, internal, content, design, development,
           admin, research, meeting, deliverable
  colors:  red, blue, gray, pink, purple, green, brown, yellow, orange, default
  1. Verify the database was created by calling notion-fetch with the returned database ID
  1. Confirm creation to the user:
Project tracker created: "[Project Name] Tracker"
Database ID: db_xyz789

Properties configured:
  - Task Name (title)
  - Status (5 stages: Not Started > In Progress > In Review > Complete > Blocked)
  - Priority (4 levels: Urgent, High, Medium, Low)
  - Owner (text)
  - Due Date (date)
  - Project Phase ([number] phases)
  - Description (rich text)
  - Dependencies (rich text)
  - Tags (10 default tags)

IF THE PARENT PAGE IS NOT FOUND:

  • Ask the user for the exact page title or a URL
  • Try notion-search again with the corrected term
  • If still not found, ask the user to share the page with the Notion integration
  • After 3 failed searches, stop and explain: "I cannot find that page. Please verify the page exists and that the Notion integration has access to it. Check Settings > Connections in Notion."

IF DATABASE CREATION FAILS:

  • Check the error message for permission issues
  • Verify the parent page ID by calling notion-fetch on it
  • Retry once with the same parameters
  • If it fails again: "Database creation failed. This usually means the Notion integration does not have permission to create content on that page. Go to the parent page in Notion, click the three-dot menu, go to Connections, and ensure the integration has 'Can edit' access."

Phase 3: Pre-Populate Tasks from Project Brief

  1. Parse the user's project brief, scope document, or task list into discrete tasks
  2. For each task, map the data to the schema:
  • Task Name -- short, action-oriented (start with a verb: "Design homepage wireframe", "Write onboarding email sequence")
  • Status -- default to "Not Started" for all new tasks
  • Priority -- infer from context; milestone items and deadline-sensitive tasks get "High" or "Urgent"; default to "Medium"
  • Owner -- assign based on user instructions or skill/role matching; leave empty if no team info provided
  • Due Date -- calculate from timeline if provided; distribute tasks across phases evenly if only start/end dates given
  • Project Phase -- assign based on task nature and project flow
  • Description -- extract relevant details, acceptance criteria, or specifications from the brief
  • Dependencies -- note if a task explicitly depends on another task (e.g., "Design must complete before Build begins")
  • Tags -- infer from task content (e.g., client deliverable = client-facing + deliverable, research task = research)
  1. Call notion-create-pages to add all tasks to the database
  1. Report seeding results:
Tasks imported: 20 of 20 successful

  PLANNING (4 tasks):
    Define project requirements          — Medium, Sarah, Due: Mar 10
    Audit existing website analytics     — High, Marcus, Due: Mar 12
    Stakeholder kickoff meeting          — Urgent, Sarah, Due: Mar 7
    Compile brand asset inventory        — Low, Unassigned, Due: Mar 14

  DESIGN (5 tasks): [listed with owner, priority, due date]
  BUILD (7 tasks): [listed with owner, priority, due date]
  REVIEW (2 tasks): [listed with owner, priority, due date]
  LAUNCH (2 tasks): [listed with owner, priority, due date]

Total: 20 tasks | Assigned: 16 | Unassigned: 4 | Milestones: 3

IF THE BRIEF IS VAGUE OR INCOMPLETE:

  • Generate reasonable tasks based on the project type and phases
  • Present the generated task list to the user for approval BEFORE creating pages:
  I generated 18 tasks from your brief. Here is the breakdown by phase:

  PLANNING (3 tasks):
    1. Define target audience and goals — Medium
    2. Audit competitor websites — Medium
    3. Gather brand assets and copy — High

  Want me to proceed, or would you like to add, remove, or modify any tasks?
  • NEVER create tasks without confirmation when the data is inferred rather than explicit

IF BATCH CREATION PARTIALLY FAILS:

  • Report which tasks succeeded and which failed
  • Retry each failed task individually with notion-create-pages
  • If individual retries fail, provide the task details formatted for manual entry

Phase 4: Set Up Views and Confirm

After the database and tasks are in place, guide the user on setting up filtered views. Notion MCP does not support creating views programmatically, so provide exact instructions.

Present these 5 views for the user to create manually:

RECOMMENDED VIEWS (create these in Notion):

1. ALL TASKS (Table view)
   - View type: Table
   - Sort: Due Date (ascending)
   - No filter
   - Purpose: Full task list ordered by deadline

2. MY TASKS (Table view)
   - View type: Table
   - Filter: Owner contains [your name]
   - Sort: Due Date (ascending), then Priority (Urgent first)
   - Purpose: Personal task list for each team member

3. THIS WEEK (Table view)
   - View type: Table
   - Filter: Due Date is within the next 7 days AND Status is not "Complete"
   - Sort: Priority (Urgent first), then Due Date (ascending)
   - Purpose: Weekly sprint view showing what needs attention now

4. BY PHASE (Board view)
   - View type: Board
   - Group by: Project Phase
   - Filter: Status is not "Complete"
   - Sort: Priority (Urgent first)
   - Purpose: See active tasks organized by project phase

5. BLOCKED ITEMS (Table view)
   - View type: Table
   - Filter: Status is "Blocked"
   - Sort: Priority (Urgent first)
   - Purpose: Escalation list — resolve blockers before they cascade

Deliver a final summary including: database name and ID, task count by phase with date ranges, assigned vs. unassigned count, milestone count, and 3-4 concrete next steps (create views, assign unassigned tasks, review weekly, check blocked items daily).


Example 1: Website Redesign Project

User request: "We are redesigning our company website. 4 phases: Discovery, Design, Development, QA/Launch. Team is Sarah (PM), Marcus (designer), Priya (developer), and James (copywriter). Timeline is March 3 to April 25. My Notion page is called 'Active Projects'. Here is our scope..."

Execution:

  1. Gather: Project name "Website Redesign", parent page "Active Projects", 4 custom phases, 4 team members, 8-week timeline, scope document provided
  2. Search: notion-search for "Active Projects" -> found pg_active456, confirmed
  3. Create: notion-create-database with parent pg_active456, title "Website Redesign Tracker", custom phases (Discovery, Design, Development, QA/Launch) -> db_redesign789
  4. Seed 20 tasks:
DISCOVERY (5 tasks, Mar 3-10):
  Stakeholder kickoff meeting            — Urgent, Sarah, milestone
  Audit current site analytics           — High, Marcus
  Competitor analysis (5 sites)          — Medium, James
  Define sitemap and page hierarchy      — High, Sarah
  Compile brand guidelines and assets    — Medium, James

DESIGN (6 tasks, Mar 14-24):
  Create wireframes for 8 key pages     — High, Marcus
  Design homepage mockup                — Urgent, Marcus, milestone
  Design inner page templates           — High, Marcus
  Write homepage copy                   — High, James
  Write service page copy (4 pages)     — Medium, James
  Client design review and approval     — High, Sarah, client-facing

DEVELOPMENT (6 tasks, Mar 25 - Apr 7):
  Set up staging environment            — High, Priya
  Build homepage                        — Urgent, Priya
  Build inner page templates            — High, Priya
  Integrate contact form and CRM        — Medium, Priya
  Mobile responsive QA pass             — High, Priya
  Content migration (blog posts)        — Medium, James

QA/LAUNCH (3 tasks, Apr 11-25):
  Full QA testing across browsers       — High, Priya
  Client UAT and final approval         — Urgent, Sarah, milestone, client-facing
  DNS switch and go-live                — Urgent, Priya, milestone

Total: 20 tasks | Assigned: 20 | Milestones: 4 | Client-facing: 2
  1. Deliver: View instructions + final summary with phase breakdown and next steps

Example 2: Product Launch Project

User request: "I am launching a new online course in 6 weeks. Phases are Pre-Launch, Launch Week, and Post-Launch. It is just me doing everything. My Notion workspace has a page called 'Course Business'. I have a rough outline of what needs to happen."

Execution:

  1. Gather: Project name "Online Course Launch", parent page "Course Business", 3 custom phases, solo operator, 6-week timeline, rough outline provided
  2. Search: notion-search for "Course Business" -> found pg_course321, confirmed
  3. Create: notion-create-database with parent pg_course321, title "Online Course Launch Tracker", custom phases (Pre-Launch, Launch Week, Post-Launch) -> db_launch654
  4. Seed 15 tasks:
PRE-LAUNCH (9 tasks, Week 1-4):
  Finalize course curriculum outline       — Urgent, You, milestone
  Record video lessons (8 modules)         — High, You
  Edit and upload videos to platform       — High, You
  Write sales page copy                    — High, You, client-facing
  Design course thumbnail and graphics     — Medium, You, design
  Set up payment and checkout flow         — High, You
  Build email waitlist sequence (5 emails) — High, You, content
  Create 3 social media teaser posts       — Medium, You, content
  Set up affiliate tracking links          — Low, You

LAUNCH WEEK (4 tasks, Week 5):
  Send launch email to waitlist            — Urgent, You, milestone
  Publish sales page and open cart         — Urgent, You, milestone
  Post daily social media content (5 days) — High, You, content
  Run live Q&A or webinar                  — High, You, client-facing

POST-LAUNCH (2 tasks, Week 6):
  Send follow-up email to non-buyers       — Medium, You, content
  Collect testimonials from first students  — High, You, milestone, client-facing

Total: 15 tasks | Assigned: 15 | Milestones: 4 | Content: 4
  1. Deliver: View instructions (with solopreneur tip: skip "My Tasks" view, use "All Tasks" and "This Week" instead) + final summary with phase breakdown and milestone checkpoints

Pre-Delivery Checklist

Run this checklist before delivering the tracker to the user. DO NOT SKIP ANY ITEM.

CheckWhat to VerifyHow
Database existsDatabase was created and is accessibleCall notion-fetch with database ID
All 9 properties presentEvery property from the schema is configuredVerify in the notion-fetch response
Status options correctAll 5 statuses exist as select optionsCheck select options in database schema
Priority options correctAll 4 priorities exist as select optionsCheck select options in database schema
Project phases correctAll custom or default phases exist as select optionsCheck select options in database schema
Tags configuredAll 10 default tags (or custom set) exist as multi-select optionsCheck multi-select options in database schema
Due Date configuredDue Date is a date type propertyVerify property type in schema
Tasks seededAll tasks were created successfullyCount created pages vs. expected
No duplicate tasksSame task was not added twice during seedingCheck for duplicate task names
Owners assignedTasks have owners where team info was providedVerify Owner field on seeded pages
Due dates setTasks have due dates where timeline was providedVerify Date values on seeded pages
Milestones taggedKey deliverables are tagged with "milestone"Verify Tags on milestone tasks
View instructions deliveredUser received setup instructions for all 5 viewsConfirm in delivery message
Parent page correctDatabase lives under the page the user requestedVerify parent in notion-fetch response
Pre-Delivery Checklist:
  [x] Database created and accessible
  [x] All 9 properties configured
  [x] Status options correct (5 stages)
  [x] Priority options correct (4 levels)
  [x] Project phases correct (custom or default)
  [x] Tags configured (10 default or custom)
  [x] Due Date property configured
  [x] All tasks seeded successfully
  [x] No duplicate tasks
  [x] Owners assigned where applicable
  [x] Due dates set from timeline
  [x] Milestones tagged
  [x] View setup instructions delivered
  [x] Database under correct parent page

Recovery and Troubleshooting

Notion Search Returns No Results

If notion-search cannot find the target parent page:

  1. Ask the user for the exact page title (case-sensitive)
  2. Try searching with a shorter keyword (e.g., "Projects" instead of "Active Projects Dashboard")
  3. Ask the user to confirm the page exists and is not in a private section
  4. If 3 searches fail: "I cannot locate that page. Please verify the page title and ensure the Notion integration has access. Check Settings > Connections in Notion, find the integration, and confirm the page is shared with it."

Database Creation Fails

If notion-create-database returns an error:

  1. Verify the parent page ID by calling notion-fetch on it
  2. Check for permission errors in the response -- the integration may lack write access
  3. Retry once with the same parameters
  4. If it fails again: "Database creation failed due to a permissions issue. Please go to the parent page in Notion, click the three-dot menu, go to Connections, and ensure the integration has 'Can edit' access."

Task Seeding Partially Fails

If some tasks fail to create:

  1. Report which tasks succeeded and which failed
  2. Retry each failed task individually with notion-create-pages
  3. If individual retries fail, check if a required property is missing or malformed
  4. If retries continue to fail: Provide the task details formatted for manual entry:
   Could not import these tasks automatically:

     Set up staging environment — High, Priya, Due: Mar 25

   To add manually: open the tracker database in Notion, click "+ New",
   and enter the details above.

Notion API Rate Limits

If you receive rate limit errors during bulk seeding:

  1. Pause for 10 seconds between batches
  2. Reduce batch size to 5 tasks per notion-create-pages call
  3. Continue until all tasks are imported
  4. DO NOT skip tasks due to rate limits -- slow down and retry

User Wants to Modify the Schema Later

Notion MCP does not support modifying existing database schemas. Instruct the user:

  • To add a property: open the tracker, click "+" in the header row, choose type, name it
  • To modify a property: click the column header, select "Edit property", change type/name/options

User Wants to Add More Tasks Later

  1. Call notion-fetch to confirm the database ID and schema
  2. Parse the new tasks following the same mapping rules in Phase 3
  3. Call notion-create-pages to add the new tasks
  4. Report the additions and updated totals

Duplicate Detection

Flag potential duplicates before creating pages (e.g., "Write homepage copy" and "Draft homepage content" -- same task?). Present them to the user for confirmation. NEVER create duplicate task records -- always confirm first.


Tool Integration: Asana

When the Asana connector is available:

  1. Offer to create the project, sections, and tasks directly in the user's workspace.
  2. Confirm the project structure (sections, assignees, due-date logic) with the user before creating anything.

If Asana is unavailable: deliver the plan as a task list formatted for quick manual entry or CSV import into any project tool.

Anti-Patterns

  • DO NOT create the database without the full property schema -- adding properties after pages exist causes data alignment issues
  • DO NOT invent task details not present in the brief -- if the brief is vague, present generated tasks for approval first
  • DO NOT skip the parent page confirmation -- creating a tracker under the wrong page is difficult to undo
  • DO NOT assign owners that the user did not mention -- leave the Owner field empty for unassigned tasks
  • DO NOT deliver without the view setup instructions -- the tracker is only valuable when the user can filter and sort tasks
  • DO NOT set all tasks to "Urgent" or "High" -- a project where everything is urgent has no prioritization at all
  • DO NOT create views programmatically -- Notion MCP does not support this; provide manual instructions instead
  • DO NOT promise automated reminders, notifications, or status updates -- this is a database, not a project management app with automations

Frequently asked questions

Quick answers about Project Tracker. Tap a question to expand it.

What does the Project Tracker skill do?

Creates a project management database in Notion with tasks, statuses, owners, due dates, and priorities, pre-populated from a project brief or scope document. Use when a user needs to set up project tracking for a new engagement, wants to replace spreadsheet-based task management, or needs a lightweight PM system without paid software. You bring the context. Project Tracker brings the method.

When should you use the Project Tracker skill?

Use it when the situation matches. The short version: Use this skill when you need to: Create a project task database in Notion from a project brief, scope document, or verbal description Replace a spreadsheet, whiteboard, or sticky-note system for tracking project tasks Set up task tracking for a new client engagement, product launch, or internal initiative Build a lightweight project management system without paying for Asana, Monday, or ClickUp Pre-populate a task board with phases, owners, due dates, and priorities from a project plan DO NOT use this skill for: Client or contact relationship tracking (use a client-crm skill instead) Kanban-only boards with no task metadata (just use a plain Notion board) Enterprise portfolio management…

What mistakes does the Project Tracker skill help you avoid?

The failure modes this skill is built to catch: DO NOT create the database without the full property schema -- adding properties after pages exist causes data alignment issues DO NOT invent task details not present in the brief -- if the brief is vague, present generated tasks for approval first DO NOT skip the parent page confirmation -- creating a tracker under the wrong page is difficult to undo DO NOT assign owners that the user did not mention -- leave the Owner field empty for unassigned tasks DO NOT deliver without the view setup instructions -- the tracker is only valuable when the user can filter and sort tasks DO NOT set all tasks to "Urgent" or "High" -- a project where everything is urgent has no prioritization at all DO NOT…

What if the Project Tracker skill output isn't right the first time?

Don't start over. Fix the input, not the whole run. Notion Search Returns No Results If notion-search cannot find the target parent page: Ask the user for the exact page title (case-sensitive) Try searching with a shorter keyword (e.g., "Projects" instead of "Active Projects Dashboard") Ask the user to confirm the page exists and is not in a private section If 3 searches fail: "I cannot locate that page. Please verify the page title and ensure the Notion integration has access. Check Settings > Connections in Notion, find the integration, and confirm the page is shared with it." Database Creation Fails If notion-create-database returns an error: Verify the parent page ID by calling notion-fetch on it Check for permission errors in the…

How do I add Project Tracker to Claude, ChatGPT, or Gemini?

Click “Add to your workspace” on this page. The full Project Tracker instructions get copied to your clipboard. Paste them into Claude as a new Skill or Project, into ChatGPT as Custom GPT or Project instructions, or into Gemini as a Gem. Any AI assistant that accepts custom instructions can run it. Takes about a minute.

Together, we'll uncover what AI can improve.

It starts with one conversation about your business.

Get in touch
The AI advisory of Chris Battis
Ask a questionchris@promptsquad.ai
Portsmouth, New Hampshire